L+M Development

4511 Third Avenue

Reveal for 11-Story, 181-Affordable-Unit Mixed-Use Building at 4511 Third Avenue, Belmont

A rendering has been revealed of the 11-story, 181-affordable-unit mixed-use building planned at 4511 Third Avenue, in the Belmont section of the Bronx. The 294,207-square-foot, thru-block development (consisting of seven- and 11-story components), will host 57,549 square feet of medical space on the ground and second floors and 10,127 square feet of ground-floor retail, as YIMBY reported in February. The rental apartments above, all of which will rent at below-market rates, should average 928 square feet apiece. Amenities include a 128-car garage, storage for 96 bikes, laundry facilities, and multiple outdoor terraces. The SBH Health System (St. Barnabas Hospital, located across the street) will utilize the medical space, as well as operate a 10,800-square-foot terrace geared towards exercise for the building’s tenants.

Read More

175 Delancey Street

14-Story, 100-Unit Mixed-Use Building Rises to Eighth Floor at Essex Crossing’s 175 Delancey Street, Lower East Side

The 14-story, 100-unit mixed-use building under development at 175 Delancey Street, on the Lower East Side, is now eight stories above street level, which is a seven-story increase since April. A photo of the construction progress can be seen via the YIMBY Forums by Tectonic. The latest building permits indicate the structure will measure 177,950 square feet. The project’s four-story base will host a 55,000-square-foot medical facility run by NYU Langone Medical Center, 6,060 square feet of retail on the ground floor, a 24,000-square-foot educational facility, a 13,000-square-foot senior center fit with a coffee shop, and a 4,000-square-foot garden terrace. There will be 100 affordable senior housing units on the 10 floors above. Amenities include laundry facilities and storage for 57 bikes. Delancey Street Associates, comprised of L+M Development Partners, Taconic Investment Partners, and BFC Partners, is the developer. Dattner Architects is designing. The building is Site 6 of the Essex Crossing mega-development, and completion of this component is expected in 2017.



275 South Street

Renovation Planned at 19-Story, 256-Unit Mixed-Income Residential Building at 275 South Street, Lower East Side

In 2015, L+M Development Partners and Nelson Management Group acquired the 19-story, 260-unit mixed-income residential building, called Lands End I, located at 257-275 South Street, on the Lower East Side, for an undisclosed amount. Now, renderings of the building’s planned renovation have been revealed by Curbed NY. The 236,065-square-foot building is expected to host 256 rental apartments after the renovation, which will include the construction of a roof deck, a fitness center, a community lounge, and a laundry. There will also be 24-hour doorman service, and amenities will be available to all of the building’s residents. Units will come in studio, one-, two-, and three-bedroom configurations. Half of the apartments, which are currently partially subsidized, will continue to rent at below-market rates. ORE Design + Technology is designing. Construction is expected to be complete in early 2017.


175 Delancey Street

Construction Underway at 14-Story, 100-Unit Mixed-Use Building at 175 Delancey Street, Essex Crossing, Lower East Side

In January, news broke that New York University’s Langone Medical Center signed a lease for 55,000 square feet on three floors of the planned 14-story, 100-unit mixed-use project at 175 Delancey Street – Site 6 of the Essex Crossing mega-development – located on the Lower East Side. Now, construction is ongoing on the ground-floor of the building, The Lo-Down reports. This portion of the development will measure 177,950 square feet and will feature 100 senior housing units. In addition to the medical center, the project’s four-story base will include 6,000 square feet of retail, a 13,000-square-foot senior center with a coffee shop, a 24,000-square-foot education facility, and a 4,000-square-foot outdoor garden. Dattner Architects is behind the design, and Delancy Street Associates (L+M Development Partners, Taconic Investment Partners, and BFC Partners) is developing. Completion is expected in 2017.


Fetching more...