Community Facility

424 East 34th Street

NYU Langone’s 21-Story, 830,000 Square-Foot Hospital Expansion Rises At 424 East 34th Street, Kips Bay

In late 2013, YIMBY reported on applications for New York University Langone Medical Center’s planned Helen L. and Martin S. Kimmel Pavilion hospital expansion at 400-424 East 34th Street, located on the corner of the FDR Drive in Kips Bay. Now, Tectonic has photos of the structure and it’s 12 stories above street level and rising. The new hospital wing, which will connect to Tisch Hospital, will stand 21 stories in height and measure 830,000 square feet. The medical facility will feature single-bed inpatient rooms, procedural and operative rooms, conference rooms, and amenities like children’s play areas and a café. It will also share the same support services with the rest of the campus. Ennead Architects is designing and completion is expected in 2018.


561 St. Ann's Avenue

Reveal For Three-Story, 43,500 Square-Foot Police Station At 561 St. Ann’s Avenue, Mott Haven

The city’s Department of Design and Construction tasked the Bjarke Ingels Group to design a new three-story station for New York City Police Department’s 40th Precinct, and now the Architect’s Newspaper has the project’s reveal. The new station will be located at 561-585 St. Ann’s Avenue, currently a vacant parcel on the corner of East 149th Street, in Mott Haven. The 59-foot-tall facility will measure 43,500 square feet and will feature a central indoor atrium, a green roof, and a community meeting room. The project will also include the redesign of a triangular parking lot immediately to the north. Starr Whitehouse Landscape Architects is leading the site design work. Completion is expected in 2020.


Fordham Plaza

Pedestrian-Friendly Fordham Plaza Opens To Public In West Bronx

The $34 million renovation and redesign of Fordham Plaza – bound by East 189th Street and East Fordham Road, and Park Avenue and Firefighters Boulevard in the West Bronx – has recently been completed, according to the Architect’s Newspaper. The plaza was designed by Grimshaw Architects and features a café, market canopies, public toilets, vegetation, and seating. It also serves 12 bus lines and is directly above the Fordham station on the Metro-North Railroad. The initiative behind the project was to reduce traffic accidents and to create a more pedestrian-friendly experience. The city’s Department of Design and Construction and Department of Transportation were behind the project.


98-02 Queens Boulevard

Reveal For Eight-Story, 60-Unit Mixed-Use Building At 98-02 Queens Boulevard, Rego Park

Within the last few weeks, new details emerged of the planned eight-story, 60-unit mixed-use building being developed at 98-02 Queens Boulevard, in Rego Park, and now DNAinfo has a rendering of the project. As reported previously, the 75,000 square-foot structure will contain rental units that come in one-, two-, and three-bedroom configurations. The apartments will average 657 square feet apiece, and amenities include a gym, an indoor pool, a children’s playground, and bike storage. The entire ground floor will be retail and 7,000 square feet of community facility space, in the form of medical offices, will be located on the level above. Demolition of the existing retail structure is expected in the spring and completion is slated for late 2017. Bahar Corporation is developing and Peter Casini Architect is behind the design.


1815 Sterling Place

Reveal For Three-Story, 27,000 Square-Foot Fire Station At 1815 Sterling Place, Ocean Hill

In the fall of 2015, YIMBY reported on applications filed by the New York City Fire Department (FDNY) for the Rescue 2 firehouse, a new three-story, 27,114-square-foot fire station planned at 1815 Sterling Place, in Ocean Hill. Dezeen has revealed renderings of the building, being designed by Studio Gang Architects. The exterior will be clad in precast concrete panels and red-glazed terra cotta. The facility will include dormitories, a kitchen and dining area, office and storage space, a gym, and third-floor will feature outdoor space. Fire training will also occur at the site. The city has reportedly approved the project, and construction will begin this summer. Completion is expected in late 2017.


Fetching more...