JCAL Development

Housing Lottery Launches for The Willow at 750 East 134th Street in Port Morris, The Bronx

The affordable housing lottery has launched for The Willow, an eight-story mixed-use building at 750 East 134th Street in Port Morris, The Bronx. Designed by Newman Design Architects and co-developed by JCAL Development and Altmark Group, the structure yields 133 residences and 9,456 square feet of commercial space. Available on NYC Housing Connect are 112 units for residents at 30 to 80 percent of the area median income (AMI), ranging in eligible income from $17,006 to $140,080.

Read More



2395 Frederick Douglas Boulevard

15-Story, 75-Unit Affordable Mixed-Use Building Proposed at 2395 Frederick Douglass Boulevard, Harlem

Bronx-based JCAL Development Group has filed applications for a 15-story, 75-unit mixed-use building at 2395 Frederick Douglass Boulevard, located between West 128th and 129th streets in Harlem. The project will encompass 95,200 square feet and rise 147 feet to its roof, according to the filings. There will be 8,625 square feet of retail space for a ground-floor grocery store, followed by 75 apartments across the second through 15th floors. All of the units, averaging 910 square feet apiece, will rent at below-market rates through the housing lottery.


329 East 132nd Street

Rendering Revealed as Financing Secured for 12-Story, 91-Unit Residential Project At 329 East 132nd Street, Mott Haven

A rendering has surfaced of the planned 12-story, 91-unit residential project at 329 East 132nd Street, in the South Bronx’s Mott Haven section. It comes as the Altmark Group and JCAL Development secured $22.1 million in construction financing, Commercial Observer reported. The latest building permits, which YIMBY first reported on in 2015, show the new building will encompass 71,912 square feet. Its residential units, which will be market-rate rental apartments, should average 738 square feet apiece. Amenities include a fitness center, a lobby lounge, an outdoor recreation space on the ground floor, storage for 46 bikes, a 37-car parking garage, and a roof terrace. Aufgang Architects is behind the architecture. Foundation work was underway in May and completion is expected in early 2018.


Fetching more...