ME Architect

200 Kent Avenue Tops Out in Williamsburg, Brooklyn

The six-story reinforced concrete structure for 200 Kent Avenue is now topped-out, and window frames are now beginning to be installed for the curtain wall on the upper floors of the eastern elevation. ME Architect P.C. is responsible for the design of the commercial building, while Isaac Hager of Cornell Realty Management is the developer. The development now stands 83 feet tall above the northern section of Williamsburg, Brooklyn, and can easily be seen when traveling on the East River ferries. The lot measures 22,640 square feet, and was purchased by two anonymous entities back in the summer of 2016 for $33 million.

Read More

200 Kent Avenue

Construction Begins at 200 Kent Avenue, Williamsburg, Brooklyn

The lot at 200 Kent Avenue is now clearing out for a six-story commercial building, for which renderings have also appeared. YIMBY last reported on this site in August of 2016, when two anonymous entities purchased the empty 22,640 square foot land for $33 million. The project has been shrouded in mystery regarding a potential deal with the Trader Joe’s grocery chain for 18,000 square feet of the ground floor and cellar.

Read More

263 West 34th Street

Four-Story, 28,000-Square-Foot Retail Building Filed at 257-263 West 34th Street, Garment District

In January, news broke that Cornell Realty Management was planning a four-story, 35,000-square-foot retail building at 257-263 West 34th Street, in the Garment District section of Midtown. Now, the developer has filed applications for the project with the Department of Buildings. The structure will actually measure 28,130 square feet above grade and will feature retail space on the cellar through the fourth floors. The fourth floor will also features an upper mezzanine level that that will be utilized as retail space. Michael Even’s NoMad-based ME Architect is the architect of record. The 44-foot-wide assemblage is currently occupied by three unrecognizably altered four-story commercial buildings. Demolition permits were filed in March to knock them down.


Fetching more...