Downtown

30 Warren Street Topped-Out and Nearing Completion in Tribeca

Sitting directly across the street to the east of 108 Chambers Street, another new residential project is changing the landscape of Tribeca. Located between Warren Street and Chambers, the 12-story 30 Warren Street has already-topped out, and is currently blanketed in a web of scaffolding and black construction netting. The building is being designed by Post-Office Architects (POA), while HTO Architects serves as the executive architect. Cape Advisors is developing, the same group behind 75 West Broadway just down the block to the west.

Read More


Construction Ramps Up On the Ronald O. Perelman Performing Arts Center at the World Trade Center

After previously enduring a slight pause in construction, the site of the future Ronald O. Perelman Performing Arts Center has picked up the pace of steel assembly currently forming the bottom sub-levels of the 130-foot structure. They will eventually form the secondary entrance and exit to the World Trade Center’s Vehicle Security Center. The project is already above street level and is being developed by the Port Authority of New York and New Jersey (PANYNJ), and designed by Joshua Prince-Ramus of Brooklyn-based REX Architecture. A 99-year lease was already  approved for the project by Governor Andrew Cuomo.

Read More

111 Murray Street, image by Andrew Campbell Nelson

111 Murray Street Nearly Complete as Facade Installation Wraps, Tribeca

Nearly four years after permits were filed, 111 Murray is almost entirely finished. The 792-foot tall structure will add 157 condominiums to the Lower Manhattan and Tribeca market. After applications were approved in May of 2015, construction was quick to start. Now, the development by Fisher Brothers, Witkoff, and New Valley is nearing completion. All that remains to be installed of the facade are two glass panels on the southwestern edge.

Read More


Fetching more...