University Heights

2429 Jerome Avenue

Four-Story, Multi-Use Building With School Filed at 2429 Jerome Avenue, University Heights

Midtown South-based Louise Paris Ltd. has filed applications for a four-story, 42,786-square-foot mixed-use building at 2429 Jerome Avenue, in University Heights, located directly below the Fordham Road stop on the 4 train. The structure would feature 7,640 square feet of ground-floor retail space, as well as a 24,956-square-foot school. The ground floor will host the school’s lobby, followed by classrooms on the second through fourth floors, and a playground on the rooftop. Mansukhbhai Patel’s New Jersey-based Vista Engineering Corp. is the applicant of record. An assemblage of five buildings – two three-story structures and two single-story buildings – at 2421-2431 Jerome Avenue must first be demolished.



Jerome Avenue near Burnside Avenue

When Rezoning Isn’t Just About Housing: Planning the Future of Jerome Avenue

Over the last few months, the Department of City Planning has lost the PR battle over the proposed Jerome Avenue rezoning. Residents and activists accused the city of trying to create a new neighborhood called “Cromwell-Jerome,” a reference to DCP’s initial plans for a zoning study, and in response, officials dropped “Cromwell” from the title. In reality, planning officials hope to revitalize a narrow, 73-block stretch around Jerome, from 167th Street to just south of Fordham Road. They want to improve parks, the streetscape, retail, community services, schools, and economic growth, instead of simply pushing through more housing development.

Read More

1959 University Avenue

New 10,000 Square-Foot Retail Building Filed For 1959 University Avenue, University Heights

Sopher Realty has filed applications for a single-story, 9,745 square-foot commercial-retail building spanning the lots at 1953-1965 University Avenue, in University Heights. Howell Belanger Castelli Architects is designing, and the existing single-story retail structure most recently passed pre-demolition inspection late in March. The site’s current structure was involved in a fire late last year, according to DNAinfo.


Fetching more...