Renderings Revealed for Terminal Logistics Center by JFK Airport, Queens

Terminal Logistics Center, design by Craft ArchitectsTerminal Logistics Center, design by Craft Architects

Triangle Equities has announced an expedited construction plan for their Terminal Logistics Center by the John F. Kennedy Airport. Located at 130-24 South Conduit Avenue in South Ozone Park, Queens, the building will be a multi-tenant hub for air and ground cargo. Groundbreaking has been moved forward to the middle of 2019.

Terminal Logistics Center at night, design by Craft Architects

Terminal Logistics Center at night, design by Craft Architects

Along with this new report, new renderings are out, revealing yet more about the design soon to rise. Craft Architects are responsible for the exterior.

Terminal Logistics Center at night, design by Craft Architects

Terminal Logistics Center at night, design by Craft Architects

Triangle Equities purchased the site in March for $25.4 million. The plan will be a three-story industrial and air cargo spread across 300,000 square feet. The project will be adding much-needed Class-A industrial space to the area around JFK, and help improve commercial logistics for the area. It will, in fact, be the first multi-story air cargo facility to serve the airport’s market.

Truck ramp at Terminal Logistics Center, design by Craft Architects

Truck ramp at Terminal Logistics Center, design by Craft Architects

The building is immediately beside the Belt Parkway, offering immediate transit access, and connection to the combined ports of New York and New Jersey, being the third largest port in the United States.

South Elevation of Terminal Logistics Center, design by Craft Architects

South Elevation of Terminal Logistics Center, design by Craft Architects

Tenant occupancy is expected to begin by 2020. Permits for construction have not been filed yet.

Subscribe to YIMBY’s daily e-mail

Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews

.

3 Comments on "Renderings Revealed for Terminal Logistics Center by JFK Airport, Queens"

  1. Please pardon me for using your space: I expect on next. (Hello YIMBY)

  2. Has anyone considered the school,and the crazy traffic in the am rush all along 130th st, north and south conduits? and now with the cargo trucks that will be taking over? with all the children?

  3. So glad the developer decided to use non-union labor on site. The construction is at a snails pace and the crane hasn’t moved in months. The city gave the site a stop work order for not building the stairs properly??? Cheap labor=Cheap result.

Leave a comment

Your email address will not be published.


*