New Rochelle

45 Harrison Street

City Launches Request for Proposals for Mixed-Use Development Site at 45 Harrison Street, New Rochelle

The City of New Rochelle, in Westchester County, N.Y., has launched a request for proposals (RFP) for the downtown development site at 45 Harrison Street, located on the corner of Cedar Street. The 30,492-square-foot city-owned site could accommodate a building up to 28 stories in height, the Daily Voice reported. A project could include a mix of uses, including residential apartments, commercial space, such as office or retail space, hotels, and/or medical or civic facilities. An existing two-story, 20,000-square-foot fire station currently occupies the property.


587 Main Street

Work Begins on 28-Story, 280-Unit Mixed-Use Redevelopment at 587 Main Street, New Rochelle

A groundbreaking ceremony has been held for the 28-story, 280-unit mixed-use tower under development at 587 Main Street, in downtown New Rochelle, in southern Westchester County. The project is a redevelopment of the abandoned two-story Loew’s Theater, Westfair reported. The theater’s façade will be preserved and restored, while the performance space will be converted into a 10,000-square-foot black box theater. In addition, the base will include 17,000 square feet of commercial space and a 234-car parking garage. The residential units in the tower will be rentals. RXR Realty, Brause Realty, and ABS Partners Real Estate are the developers. Paulus, Sokolowski and Sartor (PS&S) is the architect and completion is expected in late 2018.


22 Burling Lane

Six-Story, 110-Unit Residential Building Planned at 22 Burling Lane, New Rochelle

ELD Properties and Equity Land Developers are planning a six-story, 110-unit residential building at 22 Burling Lane, in downtown New Rochelle. That’s in southern Westchester County. Dubbed Millennia, the project will have rental apartments ranging from studios to two-bedrooms, 11 of which will rent at below-market rates as affordable housing, Westfair reported. Amenities will include a fitness center, a yoga room, a business center with conference rooms, a lounge, private residential storage space, a pet park, and a 146-car parking garage. The developers also want to build a path along the New England Thruway (I-95) that connects to a park they’re planning at the end of Burling Street. The park will include an existing pedestrian bridge, expected to be reopened, that crosses the Thruway. The assemblage at 22-26 Burling Lane includes a two-and-a-half-story house and a three-story office building. Demolition is expected to begin in the next few weeks, with completion of the new building scheduled for 2017. The city’s Metro-North Railroad station is on the other side of the Thruway.


700 Davenport Avenue

Eight-Building, 72-Unit Condominium Project Approved at 700 Davenport Avenue, New Rochelle

Purchase, N.Y.-based Zinrock Resources LP has recently received approval from the Planning Board of New Rochelle to construct nine eight-unit residential buildings, plus a clubhouse and gatehouse, at 700 Davenport Avenue, located on the southern tip of the city’s Davenport Neck section. That’s in southern Westchester County. The buildings can be as high as 60 feet (plus five feet if in a flood zone), the equivalent five stories, Westfair reported. All of the residential units will be three-bedroom condominiums ranging from 3,000 to 3,500 square feet apiece. The site is currently home to the roughly 500-member beach club Beckwith Pointe, which the developer is expected to begin demolishing next year. Zinrock payed the city $720,000 to privatize the club’s beachfront, but is still required to retain open space elsewhere.


690 North Avenue

Seven-Story, 310-Student Iona College Dormitory Under Construction At 690 North Avenue, New Rochelle

Iona College is currently building a seven-story, 310-student dormitory at 690 North Avenue, in New Rochelle, located in Westchester County. According to Westfair, construction began early last year and the project was recently awarded a $2.5 million from the state Higher Education Capital Matching Grant Program Board. The building will feature publicly accessible retail and restaurant space on the ground floor. Completion is expected sometime later this year, before the start of the fall semester.


Fetching more...