Financing has been secured for 35-19 Steinway Street, a four-building residential development with structures ranging from 13 to 26 stories in Astoria, Queens. Designed by Issac Stern Architects and developed by EMP Capital Group, the 324,000-square-foot project will yield 335 rental units, including 84 residences reserved for affordable housing. The development will also include 20,000 square feet of amenity space, a 7,600-square-foot community facility, and lobby and retail spaces on the first two floors. 35-19 Steinway Street’s anticipated completion is slated for May 2028.
Renderings depict four interconnected buildings with gridded façades, rounded corners, and continuous horizontal bands. Two taller volumes are clad in pale stone and glass, while a lower central structure is distinguished by reddish-brown framing. Planted terraces and landscaped areas are positioned between the buildings. Issac Stern Architects describes the upper floors as combining glass with banded stone detailing, contrasted with heavier geometric forms at the lower levels. Inc. Architecture & Design is responsible for the interiors.
Residences will range from studios to three-bedroom layouts, each with in-unit laundry machines. The individual buildings will contain between 77 and 99 apartments. A portion of the residential inventory will be dedicated to affordable housing through a 35-year tax abatement under the Affordable Neighborhoods for New Yorkers program.
Amenities will be distributed across the cellar, 14th and 15th floors, and the top floor of each building. Planned offerings include a gym, pool, sauna, yoga and Pilates rooms, squash and basketball courts, golf and Formula One simulators, a movie room, music and karaoke rooms, a podcast room, a coworking lounge, a pet spa, a library, and a game room.
Subscribe to YIMBY’s daily e-mail
![]()
Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews








This is a residential incursion into a commercial area. Some zoning changes were likely made. A sign states that the P. C. Richard will remain open during the construction in its parking lot.