131-141 East 47th Street

New Rendering Reveals 141 East 47th Street’s Art Deco-Inspired Details in Midtown East, Manhattan

A new rendering has been revealed for 141 East 47th Street, a 35-story residential tower in Midtown East. Excavation is underway for the 183,310-square-foot project designed by Ismael Leyva Architects and developed by Silverback Development. The latter was brought on by Hopson Development Holdings, which previously purchased the parcel for $115 million in December 2019 from the original developers, New Empire Real Estate. The property will contain a mix of studios through two-bedroom units averaging around $1.5 million apiece, as well as 5,000 square feet of ground-floor retail space.

Read More

Excavation Begins at 141 East 47th Street in Midtown East

Excavation is underway at 141 East 47th Street, the site of a 35-story residential tower in Midtown East. The 183,310-square-foot project is designed by Ismael Leyva Architects and developed by Silverback Development. The latter was brought on by Hopson Development Holdings, which purchased the parcel for $115 million in December 2019 from the original developers, New Empire Real Estate. Located between Park Avenue and Lexington Avenue, the development is set to yield 200 units and cost $250 million.

Read More

Planned Skyscraper at 131-141 East 47th Street Appears Stalled, Likely Another Casualty Of Chinese Capital Outflow Restrictions in Midtown East, Manhattan

YIMBY’s recent reportage on a new wave of failed development sites has yet another likely addition. Renderings for the new look of 131-141 East 47th Street were revealed by YIMBY back in April of 2016, and since then, the site for the 49-story, 122-unit residential tower has been cleared of the previously extant structures. However, over two years post-demolition, work has appeared to come to a grinding halt, with no subsequent progress yet visible. The project is being developed by New Empire Real Estate, with SLCE Architects leading design, with the Chinese crackdown on capital outflows a likely explanation for the apparent pause in construction.

Read More



Fetching more...