Prospect Heights

Touring the World’s Tallest Modular Building at 461 Dean Street in Pacific Park

After four years of delayed construction, financial missteps, and lawsuits, Forest City Ratner and Greenland U.S.A. are finally welcoming tenants into 461 Dean Street, currently the tallest skyscraper in the world constructed with modular units. The 32-story tower on the edge of Prospect Heights and Park Slope offers sweeping views of brownstone Brooklyn, but its lengthy construction saga highlights the myriad issues facing developers who want to build with modular construction.

Read More

16 Underhill Avenue

Four-Story, Four-Unit Residential Project Planned At 16 Underhill Avenue, Prospect Heights

Brooklyn-based Infinity Properties has filed applications for a four-story, four-unit residential building at 16 Underhill Avenue, in Prospect Heights. The project will measure 5,513 square feet and its residential units should average 1,207 square feet apiece. The full-floor apartments will likely be condominiums. Gerald J. Caliendo’s Briarwood-based architecture firm is the architect of record. The 30-foot-wide, 2,427-square-foot property is vacant. The Clinton-Washington Avenues stop on the C train is two blocks away.

Read More

856 Pacific Street

Diocese of Brooklyn Plans Four-Story, 47,700-Square-Foot Office Building at 856 Pacific Street, Prospect Heights

The Co-Cathedral of St. Joseph, located at 856 Pacific Street in Prospect Heights, has filed applications for a four-story, 47,722-square-foot office building directly to its east, DNAinfo reported. The new building will contain 23,021 square feet of community facility space and will likely be occupied by the Diocese of Brooklyn. The ground floor will contain a lobby, a parking garage, a screening room, followed by office space on the second through fourth floors. An outdoor terrace will be located on the ground floor. Midtown South-based PBDW Architects is the architect of record. The site is vacant, with exception of a three-story, 8,133-square-foot rectory building. Demolition permits were recently filed.

Read More

496 Prospect Place

Six-Story, Six-Unit Residential Building Planned at 496 Prospect Place, Prospect Heights

Brooklyn-based Level One Holdings has filed applications for a six-story, six-unit residential building at 496 Prospect Place, in Prospect Heights. The structure will measure 9,855 square feet and its residential units should average 1,230 square feet apiece, indicative of condominiums. There will be one apartment per floor, and private residential storage units will be located in the cellar. Parking is not included, as none is required. Midtown South-based Issac & Stern Architects is the architect of record. The 36-foot-wide, 2,469-square-foot property is currently occupied by a single-story building. Demolition permits haven’t been filed. The site is located six blocks from the Eastern Parkway-Brooklyn Museum stop on the 2 and 3 trains.

Read More

38 Sixth Avenue

Pacific Park’s 23-Story, 303-Affordable-Unit Mixed-Use Building Tops Out at 38 Sixth Avenue, Prospect Heights

The 23-story, 303-unit mixed-use building under development at 38 Sixth Avenue, at the corner of Dean Street in Prospect Heights, has topped out. Three months ago, the structure was merely two stories above street level. It now encompasses 341,595 square feet. It will host 8,700 square feet of retail space and medical offices on the ground floor, followed by 303 affordable residential units. All of the rental apartments will rent at below-market rates through the housing lottery. Amenities include a 73-car underground garage, space for a whopping 400 bikes, private residential storage space, a fitness center with a yoga room, a children’s playroom, and a terrace on the 16th floor. Greenland Forest City Partners, comprising of Greenland USA (the US branch of Shanghai-based Greenland Group) and Forest City Ratner Companies, is the developer. The duo are heading the 17-building Pacific Park mixed-use mega-development, of which 38 Sixth Avenue is a part. SHoP Architects is behind the design. Completion can probably be expected later this year or in early 2017.

Read More

Fetching more...