Jersey City

Former renderings of 1075 West Side Avenue - Rendering of West Side Square - Marchetto Higgins Stieve

Avenir, Three-Building, 486-Unit Mixed-Use Project at 1072 & 1075 West Side Avenue, Approved by Jersey City

Late last month, the Jersey City Planning Board approved Amerestate Holdings’s plans for three new mixed-use buildings, ranging from three to eight stories in height, at 1072 West Side Avenue and 1075 West Side Avenue, located along Broadway in the Marion section of Jersey City. Approval was also granted to combine the development assemblage into a single property, Jersey Digs reported. Across the entire project, dubbed Avenir, 486 residential units are planned in addition to 25,452 square feet of retail space. The stretch of West Side Avenue between Broadway and Fayette Avenue will be de-mapped and transformed into a public plaza. Amenities include a 384-car parking garage and rooftop terraces. The single-story building that was once home to Puccini’s Restaurant, a single-story former textile factory, and a four-story apartment building must first be demolished. Marchetto Higgins Stieve Architects is behind the design. The Journal Square PATH station is located eight blocks away.

Read More

90 Christopher Columbus Drive

Financing Secured for 50-Story, 539-Unit Residential Tower at 90 Christopher Columbus Drive, Jersey City

Ironstate Development and Panepinto Properties have landed $155.83 million in construction financing for their planned 50-story, 539-unit residential tower at 90 Christopher Columbus Drive (dubbed 90 Columbus), in downtown Jersey City. The tower will host rental apartments ranging from studio to three-bedroom configurations, averaging 789 square feet apiece, Real Estate Weekly reported. Amenities will include a swimming pool, children’s play areas, sports and entertainment rooms, residential lounges, and a library. The tower is the last phase of a multi-building complex, which includes the recently completed 50-story residential tower 70 Columbus and the 12-story, 152-key Marriott Residence Inn at 80 Columbus. Gwathmey, Siegel, Kaufman and Associates is behind the architecture. Foundation work is currently underway and completion is expected in 2018.

Read More

Berry Lane Park

17.5-Acre Berry Lane Park Opens to the Public in Jersey City

Mayor Steven Fulop, with the Jersey City Redevelopment Agency (JCRA) and other officials, held a ribbon-cutting ceremony on Saturday for the 17.5-acre Berry Lane Park, located in the Bergen-Lafayette section of Jersey City. It is the both the city’s largest municipal park and the first new one in decades. The public park is the site of a former brownfield property bound by Garfield Avenue to the west, NJ Transit’s rail tracks to the south, and Woodward Street to the east. It features two basketball courts, two tennis courts, a baseball diamond, a soccer field, bike paths, and two plazas (one with a splash pad). Over 600 new trees have also been planted. The Department of Recreation is in charge of hosting community events and games in the park. The site once consisted of abandoned and underutilized industrial properties, although the city demolished many of the structures, then remediated and graded the land by 2014. Multiple concrete silos were preserved and utilized for the splash pond. Berry Lane Park is right across the street from NJ Transit’s Garfield Avenue Hudson-Bergen Light Rail station.

Read More

Construction Wrapping on First 53-Story, 538-Unit Journal Squared Tower, 605 Pavonia Avenue, Jersey City

Kushner Real Estate Group’s 53-story, 538-unit mixed-use building at 605 Pavonia Avenue, in the Journal Square section of Jersey City, is now fully clad. The tower’s construction crane has been removed, as seen in a photo posted on Instagram by the owners via the YIMBY Forums. The rental tower contains a very large parking garage as well as retail space. It’s the first of three towers in the Journal Squared mega-development, which includes additional 60- and 70-story sibling towers. The entire development will boast 1,838 residential units and 36,000 square feet of retail space. As for this first completed tower, which topped out in December of 2015, occupancy is expected by the end of this year. HWKN and Handel Architects are responsible for the design. The complex will be located a stone’s throw away from the neighborhood’s PATH station.

Read More

500 Summit Avenue, rendering via HAP

Developer Acquires Site of Planned 42-Story, 800-Unit Mixed-Use Tower at 500 Summit Avenue, Jersey City

Back in August and December of 2014, YIMBY revealed two different conceptual designs for a planned mixed-use development at 500 Summit Avenue, in the Journal Square section of Jersey City. HAP Investments has recently closed on the acquisition of the site for $26.6 million, despite false reports that the developer purchased the property in 2014, Commercial Observer reported. It was also revealed that CetraRuddy will be responsible for the design, the same firm that produced the conceptual renderings YIMBY released in 2014. Planned is a 42-story, 800-unit tower with 30,000 square feet of retail space. The entire building will encompass 916,955 square feet, and the residential units, which will be rentals, should average 981 square feet apiece. There will be a 100-car parking garage. The 80,000-square-foot site consists of a parking lot and two dilapidated, two-story residential buildings.

Read More

Fetching more...