East Midtown Greenway Nears Completion Along the Sutton Place Waterfront in Midtown, Manhattan
Work is closing in on completion on the East Midtown Greenway, a 1.8-acre public promenade along the East River waterfront in Turtle Bay. Designed by Stantec, the 2,000-foot-long plaza runs from East 53rd to 61st Streets and is the second phase of the three-segment East Midtown Waterfront Esplanade, which will eventually stretch down to East 38th Street with recreation space for pedestrians and bicyclists. The $100 million project is located to the east of the FDR Drive and will also include a new park entrance at East 60th Street, a pedestrian bridge, and the revamping of Andrew Haswell Green Park and the Alice Aycock Pavilion.