Community Facility

295 Douglass Street

Reveal For Three-Story Renovation of Gowanus Arts Building at 295 Douglass Street, Gowanus

Property owners of the Gowanus Arts Building – a three-story, 14,750-square-foot community hub at 295 Douglass Street, in northern Gowanus – are planning to renovate and upgrade their building. The project will see the construction of a theater and gallery on the ground floor, a rooftop vegetable farm, interior renovations to art studios, and exterior upgrades, according to DNAinfo. Spoke the Hub, a nonprofit dance organization, will hold events in the new theater, which will open in early 2017. The roof farm is being dubbed Gowanus Sky Farm and will be designed by Brooklyn Grange. Civic Architecture Workshop is designing the overall project. Construction is expected to begin this summer, although some existing tenants must first move out temporarily.


Construction at 626 Flatbush Avenue. Photo by Tectonic

Construction Nears Home Stretch for The Parkline, 626 Flatbush Avenue, Prospect Lefferts Gardens

It was over a year ago YIMBY last checked in on the mixed-use project under construction at 626 Flatbush Avenue, between Fenimore Street and Hawthorne Street in Brooklyn’s Prospect Lefferts Gardens neighborhood. At that time, the 23-story building had just topped out. Now, as seen in photos sent to us by our friend Tectonic, exterior work on the Marvel Architects-designed building is very close to done.

Read More

54-08 74th Street

Four-Story, 28,000-Square-Foot Medical-Retail Building Filed at 54-08 74th Street, Maspeth

Flushing-based leasee Grand Centurion Construction has filed application for a four-story, 28,231-square-foot multi-use commercial building at 54-08 74th Street, in eastern Maspeth, located three quarters of a mile from the Grand Av-Newtown stop on the M/R trains. The structure will feature 7,903 square feet of ground-floor retail space. The second through fourth floors will contain 11,044 square feet of medical space. The project will include a 2,200 square-foot parking garage in the cellar. Maspeth-based Architects Studio is the architect of record. The 7,903-square-foot lot, at the corner of Grand Street, is currently occupied by a single-story auto-service business. Demolition permits have not yet been filed.


235 Cherry Street

JDS Development Planning 77-Story, 600-Unit Mixed-Use Building at 235 Cherry Street, Lower East Side

Since 2014, the property owners Two Bridges Neighborhood Council and Settlement Housing Fund have been in talks with an unknown developer over the 11,800-square-foot development site at 235-247 Cherry Street, on the southern edge of the Lower East Side. Now, it has been revealed that JDS Development Group is planning to build a 77-story, roughly 600-unit mixed-use building, The Lo-Down reports. The rental apartments should come in studio, one-, and two-bedroom configurations, with roughly 150 of the units permanently renting at below-market rates. There would also be 10,000 square feet of retail and a 4,600-square-foot senior community center in the tower. SHoP Architects will design the 900-foot-tall tower, which will be clad in terra-cotta and glass.

Read More

425 Grand Concourse

Team Selected to Build 24-Story, 241-Unit Passive Affordable Residential Tower At 425 Grand Concourse, Mott Haven

In June of 2015, YIMBY reported on the Request for Proposals (RFP) launched by the city’s Department of Housing Preservation and Development (HPD) for the development site at 425 Grand Concourse, in Mott Haven. Now, Mayor Bill de Blasio’s administration has selected a development team for the 30,000-square-foot site, located on the corner of East 144th Street, Politico New York reports. Trinity Financial and MBD Community Housing Corporation will build a 24-story, 241-unit mixed-use building. The 300,000-square-foot tower will contain only below-market rate rental apartments, in addition to a charter school, a medical facility, community space for cultural and social programs, and a supermarket. It will also be the largest Passive House project in the city. Garrison Playground, located immediately to the north, will be rehabilitated. The city is expected to finance the project, which must first journey through the city’s Urban Land Use Review Procedure (ULURP) process. ULURP is scheduled to begin in early 2017.


Fetching more...