302 Broadway

Six-Story, 18-Unit Mixed-Use Building Filed at 302 Broadway, Williamsburg

Brooklyn-based property owner Kazi Billah has filed applications for a six-story, 18-unit mixed-use building at 302 Broadway, located on the corner of Marcy Avenue in the heart of Williamsburg. The project will measure 26,070 square feet and rise 65 feet to its roof. There will be 5,790 square feet of ground-floor retail space, followed by 5,790 square feet of medical offices on the second floor. There will be 18 residential units, averaging 805 square feet apiece, across the fourth through sixth floors. A 12-car garage will be located on the third floor.

Read More

2272 82nd Street

Two Three-Story, Three-Unit Residential Buildings Coming to 2272 82nd Street, Gravesend

Brooklyn-based Jonico Construction & Development has filed applications for a second three-story, three-unit residential building at 2272-2276 82nd Street, in northern Gravesend. The first building, also a three-story, three-unit structure, was initially filed in October, YIMBY reported. Both buildings will measure 4,986 square feet each. Across both, the full-floor apartments should average 1,247 square feet apiece, indicative of family-sized units. Brooklyn-based Design Studio Associates is the architect of record. The 60-foot-wide, 6,000-square-foot site’s three-story house was demolished in November.

Read More


238 West Fort Lee Road

Six-Building, 421-Unit Mixed-Use Project Approved at 238 West Fort Lee Road, Bogota, N.J.

The Bogota Planning Board has approved a 421-unit mixed-use project proposed on the 14-acre development site at 238 West Fort Lee Road, along the Hackensack River in the Bergen County, N.J., borough of Bogota. Dubbed The River Club, the project will feature six residential buildings, each to rise either four or five stories in height. Ten percent, or 42 apartments, will be designated as affordable housing, Jersey Digs reported. There will also be retail space along West Fort Lee Road, as well as a two-story clubhouse and a 2,200-foot-long riverfront promenade. River Development is the developer and B&R Engineering is responsible for the infrastructure work. C-I Design Inc. is the architect. Ground breaking is expected next year, with completion anticipated by 2020.

Read More