Affordable housing

221 West 29th Street

21-Story, 95-Unit Mixed-Use Building Tops Out at 221 West 29th Street, Chelsea

Since it was two stories above street level in early June, the 21-story, 95-unit mixed-use building under construction at 221 West 29th Street, in northern Chelsea, has topped out, as seen in photos posted to the YIMBY Forums. The structure measures 105,337 square feet and rises 210 feet above street level, not including the bulkhead. There will be 671 square feet of retail space, big enough for a single store, followed by residential units on the second through 21st floors. The apartments will be rentals, averaging 828 square feet apiece, of which 19 (20 percent of the total) will rent at below-market rates through the affordable housing lottery. CBSK Ironstate — a team comprised of SK Development, CB Developers, and Ironstate Development — is  the developer. Goldstein, Hill & West Architects is behind the architecture. Occupancy is expected in 2017.


52 North Broadway

Residential Redevelopment Proposed at Former Good Counsel High School Campus, 52 North Broadway, White Plains

WB Development NB LLC has proposed to redevelop the 16-acre former Academy of Our Lady of Good Counsel High School campus located at 52 North Broadway, just north of downtown White Plains, in Westchester County. The proposals calls for two 10-story residential buildings with 400 rental apartments between them, a 125-bed assisted living facility, and a four-story, 66-unit dormitory geared toward graduate students at the neighboring Elisabeth Haub School of Law at Pace University, Westfair reported. Ten percent of the rentals would be designated as affordable. Roughly 2.7 acres would be preserved as green space and two existing buildings would be preserved. The anonymous LLC is comprised of multiple developers and investors, including Midtown South-based George Comfort & Sons Inc. Perkins Eastman is behind the architecture. The site needs to be rezoned in order for the project to be built. Applications were filed with the city’s Common Council in July.


959 First Avenue

Construction Wraps on 29-Story, 113-Unit Mixed-Use Tower at 959 First Avenue, Midtown East

Construction has wrapped up on 959 First Avenue, a 29-story, 113-unit mixed-use tower under development between East 52nd and East 53rd Street, in Midtown East. When YIMBY last checked in on the project in early 2015, façade installation was still underway. The latest photos were posted to the YIMBY Forums by Tectonic. Dubbed the Sutton, it measures 194,201 square feet and rises 353 feet above street level. There will be 2,714 square feet of ground-floor retail space, followed by residential units above, averaging 1,440 square feet apiece. Ninety of the apartments will be condominiums ranging from studios to four-bedrooms, plus a few penthouses, the largest of which has seven bedrooms. The other 23 apartments (20 percent of the total) will be designated as affordable. Toll Brothers City Living is the developer. Incorporated Architecture & Design is the design architect and Goldstein, Hill & West Architects is the executive architect. Occupancy can probably be expected soon.


105 Corporate Park Drive

Five-Story, 421-Unit Residential Complex Approved at 105 Corporate Park Drive, Harrison

The Harrison, N.Y., Town Board has approved plans to build two five-story residential buildings, with a total of 421 residential units, at 105 Corporate Park Drive. Harrison is in southern Westchester County. The residential units will be rental apartments, ranging from studios to two-bedrooms, of which 10 percent (42 units) will be designated as affordable. The complex will be accommodated by 752 parking spaces and a 5,400-square-foot restaurant. The 10.35-acre property is currently occupied by two three-story, 87,700-square-foot office buildings built during the 1970s. Both will be demolished, although the residential complex will take on a similar footprint. Normandy Real Estate Partners and Toll Brothers are the developers. Sullivan Architecture is behind the design. Construction is expected to start during the first half of 2017.



Fetching more...