MENU

Retail

Wyckoff Gardens

Request for Proposals Launched for Two-Building, 500-Unit Mixed-Income Project at Wyckoff Gardens, Boerum Hill

Last week, the New York City Housing Authority (NYCHA) and the Department of Housing Preservation & Development launched a request for proposals (RFP) for two mixed-use buildings to be built on the super-block home to Wyckoff Gardens, DNAinfo reported. Wyckoff Gardens is a 530-rental-unit public housing development consisting of three 21-story towers in Boerum Hill. The city is seeking a development team to build two new buildings at the site’s northern two corners, at 260 and 280 Wyckoff Street, which currently serve as parking lots. Planned are roughly 500 rental apartments (down from an initial 650) and at least 10,000 square feet each of ground-floor commercial-retail and community facility space. Half of the apartments would be affordable while the other half would be market-rate. Improvements to the entire premises are also possible, including the upgrade of outdoor amenities. Proposals are due September 30.

Read More


1228 Prospect Avenue

Two Three-Story, Two-Unit Mixed-Use Buildings Coming to 1228 Prospect Avenue, Longwood

Bronx-based property owner Joseph Zeolla has filed applications for two three-story, two-unit mixed-use buildings at 1228-1230 Prospect Avenue, in the West Bronx’s Longwood section. The southern building will measure 2,812 square feet, while the northern one will measure a slightly larger 3,026 square feet. Both will contain ground-floor retail space, measuring 1,372 square feet and 1,418 square feet, respectively, with the residential units located above. Across the entire project, the full-floor units should average 760 square feet apiece, indicative of rental apartments. Kenneth H. Koons’s Bronx-based architectural firm is the architect of record. The 46-foot-wide, 2,903-square-foot plot is currently vacant. The Intervale Avenue stop on the 2 and 5 trains is located four blocks away.

Read More

11-51 47th Avenue

11-Story, 55-Unit Mixed-Use Building Rises Above Street Level at 11-51 47th Avenue, Long Island City

Construction is underway on the ground floor of the 11-story, 55-unit mixed-use building being developed at 11-51 47th Avenue, in the Hunters Point section of Long Island City, located on the corner of 21st Street and Jackson Avenue. The construction can be seen in photos in a post by The Court Square Blog. Dubbed the Jackson, it will eventually measure 70,000 square feet. It will feature 1,226 square feet of retail space on the ground floor, followed by one- to four-bedroom condominiums on the floors above. On average, the apartments should measure 962 square feet apiece. Amenities are to include a fitness center, a children’s playroom, a residents’ lounge, a rooftop terrace, storage for bikes, and a 22-car parking garage. Charney Construction & Development, Ascent Development, and Tavros are the developers, while Fogarty Finger is behind the design. Completion is expected in early 2017.

Read More

172 Madison Avenue

Construction Wrapping on 33-Story, 69-Unit Mixed-Use Tower at 172 Madison Avenue, Midtown South

The 33-story, 419-foot-tall mixed-use building under development at 172 Madison Avenue, on the northwest corner of East 33rd Street in Midtown South, has now topped out and exterior construction is wrapping up. The update comes thanks to photos posted to the YIMBY Forums by JC_Heights. The 132,425-square-foot tower will eventually host 69 condominiums, averaging 1,795 square feet apiece and coming in one- to three-bedroom configurations. There will also be a mansion on the third floor and the tower will be topped by a four full-floor penthouses and a Sky House triplex apartment. The ground floor will have 4,361 square feet of retail space. Amenities include a swimming pool with accessory saunas and lockers (there will also be two private pools), a fitness center, a yoga/ballet room, bike storage, a children’s playroom, an entertainment lounge, a dog washing station, and private residential storage units. Tessler Developments is behind the project, and Karl Fischer is responsible for the design. Occupancy is expected this fall.

Read More

Fetching more...