Mixed-Use

36-18 Main Street

12-Story Hotel-Medical-Retail Complex Now Under Construction at 36-18 Main Street, Flushing

Foundation work is now underway on the site of a long-stalled-out hotel development at 36-18 Main Street, in Downtown Flushing. YIMBY can bring you news of the construction thanks to a photo posted to the YIMBY Forums by JC_Heights. Building permits for the project, which date back to 2004, detail plans for a two-tower, 12-story multi-use commercial complex that encompasses 290,195 square feet. Commercial-retail space will be located on the ground through forth floors in a common podium. One of the towers will contain a 148-key Hotel Indigo on the fifth through 11th floors. The other tower will feature medical offices on the fifth through 11th floors. The complex will also feature restaurants on the third and 12th floors. It will be served by a 345-car underground garage and have storage for 31 bikes. JWC Architect Engineer is the architect of record, while CMA Landmark Associates is developing. Completion is expected in 2018, per a Queens Courier update from 2014.


242 Elizabeth Street

Reveal for Six-Story, Five-Unit Mixed-Use Redevelopment at 242 Elizabeth Street, NoLIta

A rendering has been posted on the site of the planned six-story, five-unit mixed-use redevelopment at 242 Elizabeth Street, in NoLIta. The black-and-white rendering comes as Ervolino Group begins construction to expand the site’s existing single-story commercial building, Bowery Boogie reported. The latest buildings permits indicate the project will measure 7,667 square feet, with 1,795 square feet of commercial-retail space planned on the ground floor, which will be leased to City Gym. Each floor above will contain a single residential unit, although the top unit, a duplex penthouse, will also contain space on an upper penthouse level. The apartments should average 1,174 square feet apiece, and a Crain’s report from 2014 states that the apartments will be luxury rentals. Amenities include private residential storage units and bicycle storage. Nabil Ishac’s Midtown South-based Ishac Design Architects is the architect of record. Completion can probably be expected closer to 2017.



125 Greenwich Street

Foundation Complete for 88-Story, 273-Unit Mixed-Use Tower at 125 Greenwich Street, Financial District

Foundation work is now complete at 125 Greenwich Street, in the Financial District, the site of a planned 88-story, 273-unit mixed-use tower being developed by SHVO (headed by Michael Shvo), New Valley, and Bizzi & Partners Development. The concrete pit is now ready to make way for the tower portion, as seen in a photo by ILNY that was posted to the YIMBY Forums. The exact dimensions of building are not known, as the permits at the Buildings Department have yet to be amended, but we know it will rise 898 feet above street level (per Curbed NY) and will encompass roughly 450,000 square feet. There will be 20,000 square feet of retail space in its base and 16,000 square feet of residential amenities, including multiple terraces throughout the tower. The residential units will also be condominiums, ranging from studios to a triplex penthouse. Rafael Viñoly Architects is behind the design. Earlier this year, the developers were in the process of securing financing through various sources. Completion is expected in 2018.


123 Melrose Street

Reveal for 900-Unit Mixed-Use Rheingold Brewery Redevelopment at 123 Melrose Street and 54 Noll Street, Bushwick

Renderings have finally been revealed for All Year Management’s mixed-use development at 123 Melrose Street and 54 Noll Street, in western Bushwick, the site of the former Rheingold Brewery complex. The multi-block project, bound by Melrose and Stanwix streets and Evergreen and Flushing avenues, will feature 800 to 900 rental apartments and tens of thousands of square feet of retail space, according to Curbed NY. It’s being dubbed Bushwick II and will encompass around one million square feet. Roughly 20 percent of the apartments will rent a below-market rates through the affordable housing lottery. The developer acquired the plot for a combined $140.7 million over the past year. ODA New York is responsible for the design. New building permits have yet to reflect the latest plans. Two sprawling, single-story warehouse structures will have to be demolished.


Fetching more...