Domino Redevelopment

Permits Filed: 2 Grand Street

UPDATE: Per Two Trees’ reps, the permits for 2 Grand Street were filed first as the site has a substantial amount of infrastructure work that must be done. The first building to begin construction will…

Read More

400 Times Square

Revealed: 400 Times Square

The first renderings are up for the future hotel at 400 Times Square, which recently underwent a design shift, with SLCE replacing Handel as the project’s architect of record. 400 Times Square Associates LLC is the…

Read More

Bancroft Building

YIMBY Today

3 West 29th Street [Curbed]: Interior demolition of the Bancroft Building, at 3 West 29th Street, is currently underway; completion is expected “within six to eight months.” HFZ Capital’s plans for the site remain vague, but…

Read More

11 Beach Street

Revealed: 11 Beach Street

A tipster sent along renderings for 11 Beach Street, which is currently undergoing a major renovation as the structure transitions to rentals; per a recent post on Curbed, the building will have 27 units, with…

Read More

433 Broadway

Construction Update: 433 Broadway

Construction is finally wrapping up at 433 Broadway, which had been covered in protective wrapping for several months; the structure topped-out last summer. The building is an attractive and contextual addition to the surrounding neighborhood; Eddie Omari is…

Read More